Image
March 8, 2021 Enterprise Committee Meeting
More >>
Greenfields Park (September 15, 2020)
Removed old park equipment and replaced with 2-5 year old play equipment and swings. Project also included removing and replacing play surface material, improving subsurface drainage system and added surrounding benches. In addition to replacing old equipment, a new 5-12 year old play system was added on the south side of the park with swings, benches and subsurface drainage system.
Stonebridge #2 Park (July 28, 2020)
Removed old park equipment and replaced with 2-5 year old play equipment, 5-12 year old play equipment, cruise line and swings. Project also included removing and replacing play surface material, improving subsurface drainage system and adding surrounding benches.