Greenfields Park (September 15, 2020)

Submitted by pmaier on Tue, 03/02/2021 - 11:25

Removed old park equipment and replaced with 2-5 year old play equipment and swings. Project also included removing and replacing play surface material, improving subsurface drainage system and added surrounding benches. In addition to replacing old equipment, a new 5-12 year old play system was added on the south side of the park with swings, benches and subsurface drainage system.