Installation of River Accessories
River accessories must be removed in the fall to prepare for winter and freezing temperatures and reinstalled for public use in the spring. The floating bridge, kayak launches and docks are installed as soon as ice and river levels allow. Docks are generally installed first as they are the easiest to remove quickly should weather or river levels change suddenly. Historically, river accessories are installed in May.