Longfellow Park Parking Lot
Status: Completed June 2026
Location: Longfellow Park
Project Overview: Remove and replace the deteriorating asphalt parking lot on the west side of the park with new asphalt surfacing, improving overall condition, usability, and durability.
Forest River Park River Access
Status: Completed May 2026
Location: Forest River Park
Project Overview: Improvements to the river access at Forest River Park are focused on addressing ongoing riverbank erosion and maintaining safe access to the river. Due to continued erosion over recent years, the existing concrete ramp will be removed as a result of its deteriorating condition. The area will be excavated to a depth of approximately 12 inches and replaced with compacted crushed concrete to create a more stable and resilient surface. While the updated ramp will continue to provide access for canoes and kayaks, the previous kayak launch will not be reinstalled at this time due to the instability of the surrounding riverbank.
Fargo South Pool Mechanical Replacement Project
Status: Completed April 2026
Location: Fargo South Pool
Project Overview: This project will include complete removal and replacement of all pumps, filters, piping and strainer baskets.
Winter Tree Pruning
Status: Completed March 2026
Location: Prairiewood Golf Course, Island Park, Lindenwood Park, Red River Trail, Oak Grove Park, Mickelson Park, Madison Park, Trefoil Park, Yunker Farm Park
Project Overview: The Fargo Park District Forestry Department and contracted pruning companies work together to maintain our tree population in the winter to keep them healthy, safe, and growing properly. During winter, trees are dormant, which means pruning causes less stress and damage. Cold temperatures also reduce the spread of insects and diseases that could enter through fresh cuts. Without leaves, it is easier to see the tree’s structure and remove problem branches. This timing helps trees grow stronger and healthier when spring arrives.