Removed old park equipment and replaced with 2-5 year old play equipment and swings. Project also included removing and replacing play surface material, improving subsurface drainage system and added surrounding benches. In addition to replacing old equipment, a new 5-12 year old play system was added on the south side of the park with swings, benches and subsurface drainage system.